CFA 21/OCT/10-a
CFA 21/OCT/10-b
CFA 21/OCT/10-c
No objection to the final plans for a temporary screening facility at the main Pentagon entrance adjacent to the Metro station, as shown in materials received and dated 1 October 2010, provided that plans for a permanent facility be developed as soon as possible and that the site be restored to its original condition when the temporary structure is removed. Refer to the Virginia State Historic Preservation Office.
CFA 21/OCT/10-d
CFA 21/OCT/10-e
CFA 21/OCT/10-f
CFA 21/OCT/10-g
No objection to the concept design for a new pedestrian bridge for the Anacostia riverwalk between The Yards Waterfront Park and Diamond Teague Park, as shown in materials received and dated 6 October 2010. The preferred location for the pedestrian light poles is outboard of the guard rails so as not to obstruct the walking deck. Refer to the D.C. Historic Preservation Review Board.
CFA 21/OCT/10-h
CFA 21/OCT/10-i
No objection to the final plans for a one-year pilot project to install bicycle lanes on 15th Street between K and E Streets, NW, as shown in materials received and dated 7 October 2010, with the exception of that portion of the trail south of H Street, NW running along Madison Place and Pennsylvania Avenue pending further consultation with the Commission staff, National Capital Planning Commission, National Park Service, D.C. Historic Preservation Office, and other interested agencies. This approval includes the provision that after the one-year trial period the final plans for the permanent installation should be submitted to the Commission for review or the bicycle lane will be removed and the street restored to its previous configuration. Refer to the D.C. Historic Preservation Review Board.
CFA 21/OCT/10-j
Projects approved by delegation. See letter dated 20 September 2010. Final plans conform to previously approved concept design; case number CFA 15/JUL/10-g.
CFA 21/OCT/10-k
Projects approved by delegation. See letter dated 22 September 2010. Final plans conform to previously approved concept design; case number CFA 20/MAY/10-7.
CFA 21/OCT/10-l
Projects approved by delegation. See letter dated 24 September 2010. Final plans conform to previously approved concept design; see case number CFA 20/MAY/10-5.