OG 22-243
Returned without action. Concept application for window replacement has been inactive for an extended period of time. File new concept application with detailed and dimensioned drawings at DOB for review by the Commission.
OG 23-036
Returned without action. Concept application for an addition was withdrawn at the written request of the applicant on 28 March 2023.
OG 23-064
No objection to issuance of permit for a new pin-mounted, halo-illuminated sign within the cornice of the first-floor storefront, per supplemental materials received 27 March 2023, PROVIDED the gooseneck lights above the storefront and the free standing sign in the front yard are removed. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 23-067
The Commission regrets that the Luigi Parasmo sign was installed without approval. No objection to issuance of permit for removal of existing inappropriately-sized sign for the installation of the proposed sign, per supplemental materials received 6 March 2023, which indicate the letters will be no taller than 12 inches. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 23-128
No objection to concept design for a rear addition, underpinning, interior renovation, and removal of historic plaque on front elevation, per supplemental materials received 16 March 2023. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 23-130
No objection to concept design for storefront alterations at Cady's Alley, per supplemental materials received 16 March 2023. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 23-134
No objection to concept design for roof deck with cable railing, per supplemental materials received 23 March 2023. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 23-138
No objection to issuance of permit for two signs and alterations, per supplemental materials received 4 April 2023, including one illuminated sign on the M Street facade reading B&B Italia and one non-illuminated banner sign on the Cady's Alley facade reading "Maxalto," PROVIDED the B&B Italia sign uses warm Kelvin lighting. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 23-139
No objection to issuance of permit to construct a new two and half story rowhouse, per supplemental materials received 11 April 2023, PROVIDED the applicant coordinate an on-site mockup of the proposed materials for review by the Old Georgetown Board. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 23-140
No objection to issuance of permit to construct a new two and half story rowhouse and to repave and widen existing driveway, per supplemental materials received 11 April 2023, PROVIDED the applicant coordinate an on-site mockup of the proposed materials for review by the Old Georgetown Board. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 23-141
No objection to issuance of permit to install an aerial fiber between existing utility poles on the south side of the 3700 block of Prospect Street, NW and mount small cell equipment to the aerial fiber, per materials received 17 March 2023. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 23-143
No objection to issuance of revised permit for solar panels on roof, per supplemental materials received 23 March 2023, which indicate the panels would not be visible from a public right-of-way, and the conduit and all associated equipment would be installed on the side or rear elevations, behind an existing wall and not visible from the public right-of-way. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 23-145
No objection to issuance of permit for waterproofing at the east stair and wall, per supplemental materials received 27 March 2023, which indicate that the existing bricks on the wall would be retained and reinstalled once waterproofing is completed. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 23-146
Recommend AGAINST issuance of permit. Submitted materials are not sufficient for review. File new submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 23-147
No objection to a one-year extension of a concept design for a rear basement and first floor addition, per supplemental materials received 24 March 2023. File permit submission at DCRA with detailed and dimensioned drawings for review by the Commission.
OG 23-148
No objection to issuance of permit for applied vinyl sign at storefront window reading "Alkova Yoga + Coworking," per supplemental materials received 27 March 2023. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 23-149
No objection to issuance of permit for interior demolition on 1023, 1025, and 1027 31st Street, and demolition of non-historic rear additions on 1025 and 1027 31st Street, per supplemental materials received 10 April 2023, which include a protection plan for openings. No exterior demolition shall occur on 1025 or on historic sections on 1025 and 1027. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 23-152
Returned without action. Submission materials and a site visit on 21 March 2023 indicate that existing and proposed antennas on the tower at Leavey Center would not be visible from a public thoroughfare. Refer to the Historic Preservation Review Board.
OG 23-153
No objection to issuance of permit for rear addition at basement level, per supplemental materials received 4 April 2023. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 23-154
No objection to issuance of permit for new halo-lit, pin-mounted, aluminum signs with backplates for "Boffi" and "e DePadova," per supplemental materials received 17 March 2023, which indicate that the existing electrical connection would be reused, none of the letters would exceed 9 inches in height, and the separation bar would not exceed 12 inches in height, PROVIDED no vinyl graphics are applied to storefront except hours of operation on door. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 23-156
Recommend AGAINST issuance of permit. Submitted materials are not sufficient for review. File new submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 23-157
No objection to issuance of permit for signage for Todd Snyder, including applied vinyl sign at the transom over the entrance, per supplemental materials received 3 April 2023, PROVIDED existing light fixtures are retained. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 23-159
No objection to issuance of permit for replacement of light fixture at front, French doors at rear, and wood fence at rear, per supplemental materials received 24 March 2023, which indicate all existing windows would be retained. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 23-161
No objection to issuance of permit to replace rear porch tongue and groove floorboards with new pressure treated pine boards, per supplemental materials received 24 March 2023, PROVIDED the replacement boards are 5/4" x 6" and are painted to match the porch and house. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 23-162
No objection to issuance of permit for the installation of an aluminum pergola with fabric shades at the rear yard, per supplemental materials received 27 March 2023, which indicate the pergola would not be visible from the public way as proposed. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 23-166
No objection to concept design for removal of 1960s stone and metal stair for reconstruction of brick and stone stair to match original, per supplemental materials received 3 April 2023, PROVIDED bluestone is used for the steps and cheek-wall caps. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 23-167
No objection to issuance of permit to remove stucco and restore existing historic siding, replace standing seam metal roof with standing seam copper, and other minor exterior repairs, per supplemental materials received 28 March 2023, PROVIDED the applicant work with staff to assess the condition of the historic siding for reuse once the stucco is carefully removed. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 23-168
No objection to issuance of permit for replacement of standing seam painted metal roof with copper standing seam, repairs to the existing stucco, brick site wall, and other minor alterations, per materials received 17 March 2023. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 23-169
No objection to design-development approval for signage on the new MedStar building, per supplemental materials received 11 April 2023. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 23-170
No objection to issuance of permit to replace double-glazed wood French doors on the third floor of the south elevation with double-glazed wood French doors with lo-e coating, per supplemental materials received 29 March 2023. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 23-172
Returned without action. Supplemental materials received 29 March 2023 and a site visit on 30 March 2023 indicate the proposed door and transom replacement on the ground floor of the east elevation would not be not be visible from public thoroughfare. Refer to Historic Preservation Review Board.
OG 23-173
Returned without action. Proposed sliding door replacement on the first floor of the rear elevation would not be visible from public thoroughfare, per supplemental materials received 24 March 2024. Refer to Historic Preservation Review Board.
OG 23-174
No objection to issuance of permit for alterations and repairs to the exterior, including replacement of the painted standing seam metal roof with copper roofing and the replacement of a door on the rear dormer with a window, per supplemental materials received 28 March 2023. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 23-175
No objection to issuance of permit remove stucco and restore historic siding, replace standing seam metal roof with a copper standing seam, demo rear deck and install a railing on the second floor door of the rear elevation, and other miscellaneous repairs, per materials received 17 March 2023, PROVIDED the applicant work with staff to assess the condition of the historic siding for reuse once the stucco is carefully removed. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 23-176
No objection to issuance of permit to repair and replace exterior siding, trim, and doors using wood materials in matching profiles, and to reopen a second floor window on the rear elevation, per materials received 13 April 2023, PROVIDED the applicant work with staff to assess the condition of the historic siding for reuse once the stucco is carefully removed. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 23-178
No objection to issuance of permit for solar panels on the roof, per supplemental materials received 29 March 2023, which indicate that the panel installation and associated equipment would not be visible from the public right-of-way. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 23-179
Returned without action. Proposed fencing in side yard is not visible from public thoroughfare, per materials received 17 March 2023. Refer to Historic Preservation Board.
OG 23-182
No objection to design-development for addition of penthouse, alterations of facade and entrance, and construction of five-story addition behind two rowhouses, per supplemental materials received 17 April 2023, PROVIDED more details are provided in permit for windows, doors, and glass enclosure, as well as material samples. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission