CFA 16/JAN/25-a
Project approved by delegation. See letter dated 20 December 2024. Final design conforms with the previous recommendations of the Commission.
CFA 16/JAN/25-b
Project approved by delegation. See letter dated 23 December 2024. Final design conforms with the previous recommendations of the Commission. Refer to DC Historic Preservation Office.
CFA 16/JAN/25-c
No objection to final design for site improvements at the National Mall carousel, per materials received 2 January 2025, which indicate that a thermally treated wood will be used for the surrounding horizontal and vertical boardwalk surfaces of the carousel in lieu of the previously proposed composite wood decking.
CFA 16/JAN/25-d
No objection to concept design for alterations to existing fountain, per materials received 2 January 2025, with the final review delegated to the staff. Refer to DC Historic Preservation Office.
CFA 16/JAN/25-e
No objection to concept design for the construction of a storage tunnel and associated infrastructure for CSO 049 within Rock Creek Park, per materials received 2 January 2025. Refer to DC Historic Preservation Office.
CFA 16/JAN/25-f
No objection to concept design for replacement of exterior lighting fixtures at the Freer Gallery of Art, per materials received 2 January 2025. Scope of work includes the removal of eight non-historic streetlight poles and replacement with Washington Globe fixtures. Concept is consistent with the Monumental Core Streetscape Design Guidelines and LED Streetlight Performance Criteria documents. Refer to DC Historic Preservation Office.
CFA 16/JAN/25-g
No objection to concept design for modifications to 7 existing officers posts facilities to meet current operational requirements, per materials received 2 January 2025. Officers posts are inclusive of a booth, barriers, and associated security measures. Refer to DC Historic Preservation Office.
CFA 16/JAN/25-h
No objection to final design for construction of parking shelter for electric vehicle (EV) carts at the existing Center Building loading dock, per materials received 2 January 2025. Refer to DC Historic Preservation Office.
CFA 16/JAN/25-i
No objection to final design for modernization of building envelope, per materials received 2 January 2025. Scope of work includes replacement of all windows, new interior wall insulation and window structural supports, the cleaning of all facades, and minor limestone cladding repairs where required. Refer to DC Historic Preservation Office.
CFA 16/JAN/25-j
No objection to concept design for exterior restoration of existing facility, per materials received 2 January 2025. Scope of work includes repair or in-kind replacement of roof, facades, windows, doors, and other building elements. Refer to DC Historic Preservation Office.
CFA 16/JAN/25-k
No objection to final design for renovations and additions to Ludlow-Taylor Elementary School building and landscape, per materials received 2 January 2025. Final design is consistent with previously approved concept and associated recommendations.
CFA 16/JAN/25-l
No objection to concept design for modifications to existing firehouse building and landscape for use as a stabilization center, per materials received 2 January 2025. Refer to DC Historic Preservation Office.
CFA 16/JAN/25-m
No objection to final design for replacement of existing non-historic crushed gravel landscape pathways at Lincoln's Cottage, per materials received 2 January 2025, which indicate that the new pathways would match adjacent exposed aggregate concrete pathways and that the width and configuration of the pathways would remain the same. Refer to DC Historic Preservation Office.