OG 25-062
The Commission regrets that some of the signage was installed without permit issuance. No objection to issuance of permit for the installation of signage at Billy Hicks, per supplemental materials received 7 April 2025, which indicate that Sign H would not be installed and Sign I is limited to only the restaurant name as was required by the Old Georgetown Board. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-112
No objection to concept design for a rear two-story plus basement addition, per supplemental materials received 13 March 2025. File permit application at DOB with detailed and dimensioned drawings for review by the Commission.
OG 25-113
No objection to concept design for a rear two-story plus basement addition, per supplemental materials received 13 March 2025. File permit application at DOB with detailed and dimensioned drawings for review by the Commission.
OG 25-121
No objection to concept design for replacement of rooftop mechanical equipment on Loyola, Xavier, Ryder, and Nevils, and a new guardrail around the proposed equipment on the southern wing of Loyola Hall, per supplemental materials received 3 April 2025 and mock-up completed on 26 March 2025, which indicate the proposed equipment will be minimally visible from public thoroughfares and PROVIDED the proposed guardrail on Loyola matches the existing. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 25-134
No objection to issuance of permit for the installation of 58 wall-mounted anchors on the parapet walls at Georgetown University's Lauinger Memorial Library, per supplemental materials received 11 March 2025. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-141
No objection to concept design for various exterior alterations and underpinning, per supplemental materials received 17 March 2025, PROVIDED the siding to be uncovered on the north elevation is stained or painted with either linseed oil or oil-based paint; any salvageable siding under the stucco on the west elevation is retained and repaired; and the replacement railing must be made of iron and match the design of the existing. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 25-156
No objection to issuance of permit for a halo-illuminated sign reading, "Filomena Emporium", pin-mounted to the existing wood sign band, per supplemental materials received 21 March 2025, which indicate the sign will consist of two lines of text with a combined height of 12 inches. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-161
No objection to issuance of permit for Oak Hill Gatehouse landscape alterations, per supplemental materials received 1 April 2025, PROVIDED the fireplace brick veneer is slightly different from the brick on the adjoining existing garage building and the applicant submit a material sample to be reviewed by the Old Georgetown Board. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-164
No objection to concept design for a new six-story, plus penthouse residential building, per supplemental materials received 27 March 2025, PROVIDED the applicant provides a mock-up of proposed exterior materials on site for review by the Old Georgetown Board. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 25-165
No objection to issuance of permit for rooftop solar panels, per supplemental materials received 3 April 2025 and mock-up completed on 19 March 2025, PROVIDED the AC disconnect is placed on the side elevation behind the fence and painted to match the adjacent wall surface and the rooftop panels are not visible from public space. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-167
Returned without action. Concept application for rooftop mechanical is a duplicate of application OG 25-121 / HPA 25-139.
OG 25-170
No objection to issuance of permit to replace window well and basement window, per supplemental materials received 7 April 2025, which indicate the well is covered with a metal grate and flush with the sidewalk as was required by the Old Georgetown Board. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-171
No objection to issuance of permit for new wood canopy and doors on the west elevation of the building, per supplemental materials received 4 April 2025, PROVIDED the entry sign is mounted through the mortar joints and not the brick. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-172
No objection to issuance of permit for replacement of casement windows at three rear dormers, installation of aluminum storm windows at first floor of front elevation, restoration of existing light fixtures at entrance, and painting garage, per supplemental materials received 2 April 2025. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-173
No objection to issuance of permit to remove the storm door, replace the front door, and replace the sconce, per supplemental materials received 18 March 2025, PROVIDED the existing transom and associated trim are retained. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-174
No objection to issuance of permit for one-story addition at third floor of existing side addition, per supplemental drawings received 20 March 2025, which indicate single-glazed, true-divided-lite wood windows. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-175
No objection to issuance of permit for rooftop solar panels, per supplemental materials received 24 March 2025 and on-site mock-up conducted on 19 March 2025 which indicate the rooftop installation will not be visible from public space. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-176
No objection to issuance of permit for rooftop solar panels, per supplemental materials received 3 April and mock-up conducted on 19 March 2025, PROVIDED the panels are not be visible from public space. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-177
No objection to issuance of permit for 28 rooftop solar panels, per supplemental materials received 24 March 2025, which indicate conduit and equipment would be installed on the rear elevation. An onsite mockup inspection on 21 March 2025 indicated that the installation would be minimally visible from the public way. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-178
No objection to issuance of permit for signage for The Tox, including one blade sign and one wall-mounted sign, per supplemental materials received 21 March 2025. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-179
No objection to concept design for a wall sign above the main entrance reading, "Victoria's Secret" in 9-1/4" tall letters, per materials received 14 March 2025, PROVIDED the lettering is installed on a backer panel to minimize damage to the facade, the sign is non-illuminated, and the proposed awnings are lowered and lettering removed from the valance. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 25-181
No objection to issuance of permit for removal of existing steel trellis for the construction of a permanent roof structure with skylights over the existing courtyard, and removal of existing mansard roof at bay window to extend the brick upward to meet the new cover, per materials received 14 March 2025, which show the extension of the bay is clad in copper. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-182
No objection to issuance of permit for freestanding campus directory signs and wayfinding signs, per materials received 14 March 2025. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-183
No objection to issuance of permit for installation of six light poles at Georgetown University's Shaw Field, per supplemental materials received 21 March 2025. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.