OG 24-231
No objection to issuance of permit for rooftop solar panels, per supplemental materials received 19 December 2024 and mock-up completed on 19 December 2024. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 24-352
No objection to issuance of permit to replace the exterior doors and surrounds on the south elevation, per supplemental materials received 11 February 2025. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-011
No objection to concept design for Oak Hill Cemetery Gatehouse landscape alterations, per supplemental materials received 20 January 2025, PROVIDED that the lawn is an oval running north-south and the oyster shell perimeter path is removed. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 25-031
Returned without action. Concept application for a rear addition was withdrawn at the written request of the applicant on 9 January 2025.
OG 25-043
No objection to concept design for a second floor addition on the existing one-story west wing of the building, per supplemental materials received 27 January 2025. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 25-048
No objection to concept design for a pergola with retractable canopy on the east elevation and alterations to the doors on the west elevation, per supplemental materials received 9 January 2025, PROVIDED the applicant study alternative materials and design for the proposed pier supports of the pergola. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 25-053
Returned without action. Concept application for elevator addition was superseded by permit application under case OG 25-114/HPA 25-132.
OG 25-064
Returned without action. Permit application for door replacements and signage was superseded by permit application under case OG 25-120/HPA 25-138.
OG 25-079
No objection to issuance of permit for front stoop and areaway expansion, door replacement, and railing alteration, per supplemental materials received __ February 2025, PROVIDED the applicant prepare a detailed narrative and drawings of the modified railings along the stairs that detail what ironwork will be retained and what will be newly fabricated to fit the enlarged stoop. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-081
No objection to issuance of permit for replacement of existing wood, vertical-board fence with a new 6-ft-tall, capped wood-paneled fence, per supplemental materials received 28 January 2025. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-082
Returned without action. Concept application for a second floor addition is a duplicate submission and superseded by OG 25-043 / HPA 25-047.
OG 25-083
No objection to issuance of permit to replace playground equipment at Holy Trinity Catholic School, per supplemental materials received 23 January 2025. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-084
No objection to issuance of permit for the installation of solar panels on the roof, per mock-up completed 28 January 2025 and supplemental materials received 31 January 2025, which indicate that the panels on the roof and the equipment and conduit that would be installed on the rear elevation would not be visible from the public way. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-085
No objection to issuance of permit for demolition and reconstruction of brick wall above storefront on 27th Street, per supplemental materials received 22 January 2025, PROVIDED the wall matches exactly the existing in materials, design, and dimensions. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-086
No objection to concept design for an individually, pin-mounted wall sign reading, "FRAMEBRIDGE", per materials received 10 January 2025, PROVIDED the sign is mounted through the mortar joints and not the brick, all existing holes in the masonry are patched with a color-matched mortar, and the sign is halo-illuminated and not edge lit. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 25-087
No objection to issuance of permit for alteration of basement door and installation of meters on south side of house, per supplemental materials received 5 February 2025, PROVIDED Option 4 is used for the meter placement. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-088
The Commission regrets that work commenced without permit issuance. No objection to issuance of permit to install security cameras and bars over some windows and replace front and rear doors, per supplemental materials received 22 January 2025, PROVIDED that if the cameras have been mounted into the brick they are reinstalled in the mortar and any penetrations in the brick caused by their installation before review are repaired. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-089
No objection to concept design for alterations at north roof slope, per materials received 21 January 2025, PROVIDED Option B is used. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 25-090
No objection to issuance of permit for front windows replacement, per supplemental materials received 3 February 2025, PROVIDED the applicant revise the drawings to show the windows would be aluminum-clad wood. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-091
No objection to issuance of permit for halo-lit, panel-backed Georgetown Shops channel letter sign, per supplemental materials received 23 January 2025. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-094
No objection to concept design for rooftop solar panels, per supplemental materials received 10 February 2025. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 25-095
No objection to issuance of permit for front stone stoop repair and replacement, per materials received 10 January 2025. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-096
No objection to issuance of permit for replacement of TPO on flat section of roof with TPO to match existing, replacement of slate roofing at rear mansard of house with slate to match existing in design, size, and color, and replacement of half-round gutters to match existing, per supplemental materials received 22 January 2025, PROVIDED as much existing slate is reused as possible, and new slate matches existing in color, size, and shape. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-097
No objection to issuance of permit to construct rear addition, per supplemental materials received 13 February 2025. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-099
No objection to issuance of permit for a painted sign on the fascia of the first-floor bay that would read "TILLEY'S" in 10-inch letters, per supplemental materials received 21 January 2025. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-101
Returned without action. Submission materials and a site visit on 15 January 2025 indicate that the proposed door replacement at the rear would not be visible from a public thoroughfare. Refer to the Historic Preservation Review Board.
OG 25-102
No objection to issuance of permit for halo-lit, pin-mounted sign reading "Sweaty Betty," per supplemental materials received 23 January 2025. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-103
No objection to issuance of permit to partially demolish the rear ell to increase floor to ceiling heights, add skylights, and replace non-historic windows and siding, per materials received 10 January 2025. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-104
No objection to issuance of permit to install a 12-inch, individually pin-mounted sign above first floor with halo-illumination reading, "The Salty" and to remove existing awning and install new wood cornice on storefront located on the southern elevation, per supplemental materials received 21 January 2025. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-105
No objection to issuance of permit for the installation of solar panels on the roof, per mock-up completed 24 January 2025 and supplemental materials received 28 January 2025, which indicate that the panels on the roof and the equipment and conduit that would be installed at the east-side elevation would not be visible from the public way. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-108
Returned without action. Submission materials indicate that existing and proposed antennas on the tower at Leavey Center would not be visible from a public thoroughfare. Refer to the Historic Preservation Review Board.
OG 25-110
No objection to issuance of permit for replacement of the existing asphalt shingle roof with a new asphalt architectural shingle roof and replacement of two skylights, per supplemental materials received 17 January 2025. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-114
No objection to concept design for an elevator addition, per supplemental materials received 23 January 2025, PROVIDED the applicant does not reinstall shutters on the elevator addition and the cladding is flush with the exterior wall at the adjacent property at 2803 P Street, NW. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 25-115
No objection to issuance of permit for a two-story addition to the front of the existing house, per supplemental materials received 3 February 2025, which indicate the exterior light fixtures will be electric. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-116
No objection to concept design for removal of existing steel trellis for the construction of a permanent roof structure over the existing courtyard, and removal of existing mansard roof at bay window to extend the brick upward to meet the new cover, per materials received 17 January 2025, PROVIDED extension of bay is clad in copper. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 25-117
No objection to issuance of permit for replacement of wood vertical-board fence with a new wood capped vertical-board fence, per supplemental materials received 17 January 2025. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-118
No objection to issuance of permit to increase the roof height of the northern wing to enlarge the second floor, relocate the front entrance, make fenestration changes, and landscape alterations, per supplemental materials received 22 January 2025. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-119
No objection to issuance of permit to remove the rear porch and replace it with two-story addition and window and fence alterations, per supplemental materials received 23 January 2025. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-120
No objection to issuance of permit for the Amorino channel letter wall sign on a backer panel, per the supplemental materials received 21 January 2025. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 25-122
No objection to concept design for installation of new areaway, door, and railings at Georgetown University's Henle Dorm Building E, per supplemental materials received 30 January 2025. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.