OG 26-215
3333 Prospect Street, NW
United States
No objection to concept design for two-story addition, addition at ell above enclosed side porch, and alterations, per supplemental materials received 16 October 2026, PROVIDED the window proportions are studied to better relate to the existing fenestration, all materials are wood, and no additional penetrations are made through the second floor of the masonry at the ell. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 26-220
1068 30th Street, NW
United States
No objection to issuance of permit to replace the cheek walls, pediments, and sills on each of the four dormers, per supplemental materials received _ November 2026, PROVIDED flashing is drawn and labeled on the plan of the proposed sills; the wood is painted with oil or alkyd paint but not acrylic; the applicant includes a letter of approval from the easement holder; and the metal roofing and sheathing on the dormer walls and roofs are not to be replaced or altered. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 26-221
1211 30th Street, NW
United States
No objection to issuance of permit for repointing and installation of parging on brick wall, per supplemental materials received 23 October 2026, PROVIDED the replacement salvaged brick has a compressive strength that is compatible to the existing and soaked a minimum of 24 hours prior to installation; mortar analysis is completed specific to this wall section to confirm the natural hydraulic lime has an appropriate compressive strength; the paint must be carefully removed with an alkaline or an organic paint remover with a natural bristle brush and not a metal brush; areas are tested prior to starting work to determine dwell times and neutralization per the manufacturer's instructions; a low-pressure wash may be used to remove the paint to avoid further damage to the brick and mortar; the existing mortar should be carefully removed with hand tools; the existing painted parging at the base of the wall that is failing must be removed and replaced as well; the proposed parging cannot be painted; and any coping to be removed at the top of the wall must be replaced in kind. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 26-223
1410 29th Street, NW
United States
No objection to issuance of permit for the first and third floor additions and roof replacement, per the supplemental materials 2 November 2026, which indicate per the Old Georgetown Board's direction that the windows will have putty profile muntins, and the window glass will be clear, single pane and not vacuum sealed. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 26-234
3273 Prospect Street, NW
United States
No objection to issuance of permit for rear addition and roof replacement, per supplemental materials received _ November 2026, PROVIDED the applicant clarifies on the drawings if the window well cover at the front elevation would be removed or not, and if the cover is removed the replacement basement window to be exposed must comply with the Old Georgetown Board's Window Policy and Guidelines and be all wood true-divided lite window with clear class and putty muntins; the replacement gutters must be metal half rounds with round metal downspouts; the addition--particularly the proposed bathroom addition--is constructable without anchoring to the neighbor’s wall; and the applicant revises A2.1 to correctly label the front (south) and rear (north) elevations. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 26-258
3240 O Street, NW
United States
No objection to concept approval for installation of solar panels on three roof slopes on the church and Parish Hall, per supplemental materials received 14 October 2026, which indicate the panels would not be visible from the public way. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 26-303
1634 Wisconsin Avenue, NW
United States
No objection to issuance of permit for a halo-lit, pin-mounted letter sign reading "David Rios Salon" centered over the middle window on the Wisconsin facade using mortar joints for anchoring, a non-illuminated blade sign reading "Davines Academy" installed over the right pilaster at the main entrance on Wisconsin Avenue, a painted sign reading "Davines Academy" above the 33rd Street entrance, four new sconces on the 33rd Street facade, door replacement at the 33rd Street facade, and whitewashing the brick with lime-based paint, per supplemental materials received 5 October 2026, PROVIDED the signs are installed at the mortar joints. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 26-317
1659 34th Street, NW
United States
No objection to issuance of permit for the replacement of wood fence at rear with a capped 6-foot-tall wood fence, per supplemental materials received on 15 October 2026. The fence may not exceed 7 feet in height at any point. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 26-319
3028 Dent Place, NW
United States
No objection to issuance of permit for the in-kind replacement of wood fence at rear, per supplemental materials received on 22 October 2026. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 26-321
1058 Thomas Jefferson Street, NW
United States
No objection to concept design for roof deck and mechanical screening, per supplemental materials received 15 October 2026, PROVIDED the curb-mounted skylight is flat and parallel to the roof; the guardrail follows a straight line as close to the north roof edge as possible and is not stepped; and as part of the permit submission a second mockup is completed in which ropes are affixed to the top of the scaled poles to mimic the exact locations of the top rails and condenser cover. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 26-324
1633 35th Street, NW
United States
No objection to issuance of permit for the installation of solar panels on the primary structure and on the garage structure, per mockup completed 27 October 2026 and materials received ___ November 2026, PROVIDED that no equipment or conduit would be installed on the facade of the residence; the southeastern-most solar panel on the garage structure is removed from the plans because it would be visible; the two proposed panels on the east side of the main house (labeled "d") on the primary volume are removed from the plans or the applicant confirms they would not be visible from public space; and the section drawings are updated to reflect the height from the top of the roof to the top of the solar panel, not to the underside of the panel as currently depicted. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 26-329
1510 Wisconsin Avenue, NW
United States
No objection to issuance of permit for a halo-lit sign for Dayglow, per supplemental materials received ___ November 2026, which indicate that the letters would be no taller than 12', would be centered above the entrance, and would be backlit with LED tape. A logo is approved as a vinyl application on the main door. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 27-001
1225 Wisconsin Avenue NW
United States
No objection to the issuance of permit for the rear elevation roof replacement, per supplemental materials received 2 November 2026, PROVIDED an end cap or vented ridge cap is not installed and the panels are double-lock machine crimped. The Board strongly recommends the application of Acrymax or a similar coating on the front elevation roof to extend the life of the historic roof. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 27-004
1649 35th Street, NW
United States
No objection to issuance of permit for two-story rear addition, per supplemental materials received _ November 2026, PROVIDED the windows are clear with no low-emissivity coating on the glass; the applicant confirms the double-sash windows would have putty muntin profile and wood jambs or wood jamb liner covers; the roof must be hand-crimped, double-lock metal with no ridge caps; and the applicant includes a detail for the stair and handrail. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 27-005
3316 Reservoir Road, NW
United States
No objection to issuance of permit for two-story rear addition and deck and fence, per the supplemental materials received _ November 2026, PROVIDED the fences are limited to 7 feet in height measured from grade and elevations; the existing and proposed fence locations and heights are included on the site plan and floor plans and completely located within the property boundaries; the plans are revised to confirm the deck railing would completely surround the proposed deck at the rear elevation; it is confirmed that the windows would be clear without low-emissivity coatings; the proposed railings would be steel and not aluminum; and either the east elevation (A301) or the building section (A401) are revised so the fenestration patterns match. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 27-007
3327 M Street, NW
United States
No objection to issuance of permit for a pair 10-inch tall wall mounted signs for Thuma and building address numbers, per supplemental materials received 26 October 2026. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 27-008
3412 Prospect Street, NW
United States
No objection to issuance of permit to enlarge rear deck and add iron stair, replace roof with TPO, add new lighting and skylight, per supplemental materials received _ November 2026, PROVIDED the applicant include a standard detail specification for the replacement roofing; the camera and carriage lights are installed in mortar and not brick; and any downspouts to be replaced are copper or painted round metal. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 27-009
1028 31st Street and 3101 South Street, NW
United States
No objection to concept design for proposed alterations, per the supplemental materials ___ November 2026, PROVIDED the rear door at 1028 is aligned with the window above, windows are retained on street-facing elevations, replacement windows comply with the OGB Window Guidelines, inappropriately sized shutters are removed, and the coal chute cover is retained. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 27-010
3001 M Street NW
United States
No objection to issuance of permit for a non-illuminated, pin-mounted letter sign reading "Meermin," per supplemental materials received __ November 2026. No sign shall be installed on the east elevation facing 30th Street, NW. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 27-011
3061 M Street NW
United States
No objection to issuance of permit for the sign installation for "Guizio" and awning replacement, per supplemental materials received ___ November 2026, PROVIDED the sign is installed on a backer board mounted into the mortar joints or the letters are mounted using adhesive to minimize the penetrations, and the awning is open on the bottom and sides. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 27-013
6 Pomander Walk NW
United States
No objection to concept design for rear door replacement and patio modifications, per supplemental materials received 22 October 2026. Permit submission must include fully dimensioned elevation drawings for the patio bench, details on the treatment between the existing fences and retaining wall at the new bench connection, and material specification for the stone pavers. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 27-015
3312 N Street, NW
United States
No objection to concept design for site work, including relocation and reconstruction of the rear brick wall and installation of a smaller pool, per supplemental materials received ___ November 2026, PROVIDED the arched gate is reused or replaced to match existing, the brick wall and metal framing does not exceed 7' in total height, and the wall sconces align with an architectural detail. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 27-016
1317 Wisconsin Avenue NW
United States
No objection to issuance of permit for the installation of one (1) non-illuminated hanging sign for Spicewalla and the completed storefront modifications, per materials received on 15 October 2026. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 27-017
2815 Q Street, NW
United States
No objection to issuance of permit for three additions, including a rooftop addition, a two-story infill addition at the ell, and a single-story sunroom addition at the rear, per supplemental materials received ___ November 2026, which indicate pre-patinated zinc will be used for the addition and the chimneys will be retained as existing PROVIDED skylight and louver are not visible from the public way. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 27-020
3245 O Street, NW
United States
No objection to issuance of revised permit for the construction of single-family house on a vacant lot, per the supplemental materials received _ November 2026, PROVIDED lantern Option 1 is selected. The reduction of the width of the main block by 2 feet; creation of a side yard at the east property line; retention of the east cornice; and elimination of the west cornice with only fascia visible are supported. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 27-024
3021 P Street NW
United States
No objection to concept design for installation of a rear parking space and wall modifications, per materials received 15 October 2026, PROVIDED the permit submission includes the arborist report indicating potential impacts to and mitigation strategies for the existing trees, and details on the proposed timber retaining wall. Applicant must provide samples of the proposed new brick for onsite review. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 27-025
3215 R Street, NW
United States
No objection to issuance of permit for additions on the rear and east elevations, per supplemental materials received _ November 2026, PROVIDED the conservatory on the garage elevation is revised to include a re-entrant corner equal to the reveal on the left so that the window mass is centered on the garage door below; the lanterns will be electric and not gas; the single-glazed casement windows must have clear glass with no low-emissivity coatings; and the double-hung sash windows are limited to half screens if the screens are to be located on the exterior. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.