OG 26-032
No objection to issuance of permit for the streatery in front of the Graham Hotel, per supplemental materials received ___ May 2026, which indicate 5 tables, 18 chairs, and 1 umbrella, PROVIDED Option B layout with Option A chairs are used. Note this is the only streatery associated with and approved for the Graham Hotel. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 26-077
Returned without action. The applicant withdrew the permit application for rooftop solar by written request on 16 April 2026.
OG 26-128
The Commission regrets the sidewalk cafe was established prior to review. No objection to issuance of permit for the existing Billy Hicks sidewalk cafe that contains five tables and 10 chairs, per materials received 16 January 2026. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 26-129
No objection to concept design for 10 pole-mounted signs to be installed in the historic district, per supplemental materials received 27 April 2026, PROVIDED Option D is used, and a mockup is completed prior to finalization of concept recommendation showing Option D with 4 stars as proposed, as well as Option D with 3 stars above "Georgetown." File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 26-138
No objection to issuance of permit for rear addition, which unfortunately commenced without OGB review or approval, and site work, including a rolling vehicular gate at the rear property line, per supplemental materials received ___ May 2026, PROVIDED an alkaline paint remover is used for paint removal at the front, and mineral coatings and silane/siloxane sealers are not used on the front brick.
Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 26-154
No objection to concept design for the construction of a single-family house on a vacant lot, per supplemental materials received 12 May 2026, PROVIDED the applicant add vertical dimensions to the elevation drawings to include the height to the eaves, cornice, gable, and lantern; the rear block is reduced in width and height; study the eaves on the rear block; consider openings on the east elevation of the rear two blocks; propose punched windows on the first and second floors of the rear elevation; drop the cornice one to two feet on front block and study its proportions, specifically the brackets; study alternative treatments at the third floor window heads so they are more vertical than
currently; and consider only one lantern at the front door. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 26-155
No objection to issuance of permit to replace roofing, flashing, gutters, and downspouts, per supplemental materials received 12 May 2026, PROVIDED the copper panels on the back of the gable pediment are replaced in kind and the applicant include documentation of the type and location of the existing gutters and downspouts to be replaced in kind. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 26-157
Returned without action. The applicant withdrew the permit application for roof replacement by written request on 16 April 2026.
OG 26-161
No objection to issuance of permit to convert the cellar into an apartment unit with basement window wells, per supplemental materials 4 May 2026, which indicate per the Old Georgetown Board's direction that windows DW-1-07 and DW 2-06 would not be bricked in. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 26-162
No objection to concept design to replace storefront and alter window, per supplemental materials received 14 April 2026, PROVIDED the applicant pursue the option depicted on A400, Detail 10, with a single door with side lites but with solid mullions at the corners below the transoms instead of butt glazing and none of the Dekton kneewall options are supported and painted wood or metal are preferred instead. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 26-168
No objection to concept design for solar installation on 5 campus buildings, including Hariri, Healey Family Student Center, Building D, Isaac Hawkins, and Lauinger Library, per supplemental materials received 4 May 2026, which indicate that Regents was removed from the scope, and Thompson Athletic Center will be submitted at a later time to address panels on the north roof slope. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 26-179
No objection to concept design for fenestration alterations and replacements, guardrail replacements, canopy replacements, per supplemental materials
received 27 April 2026, PROVIDED the garage doors are simple, and HVAC screening at roof is metal. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 26-180
No objection to issuance of permit to replace front door, front railings, and front steps and landing, per supplemental materials received _ May 2026, PROVIDED The proposed three-lite door is not supported, and the replacement door must be Colonial Revival-style design made of solid wood; the stone landing is to be retained and repaired unless photo documentation is provided to prove it is unsalvageable; the elevations are updated to accurately show all the railings, including at the bottom stair and landing; a detail is provided for the railing design to include the existing twisted balusters and curlicues; and the applicant provides specifications for the replacement stone treads and risers and bricks, including colors. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 26-181
No objection to issuance of permit for new halo-lit sign for Frankies Bikinis, per supplemental materials received ___ May 2026, which indicate all vinyl signage on the storefront will be removed, the existing unapproved 14"-tall sign will be removed, and the new wall sign will be no taller than 12". Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 26-182
No objection to issuance of permit for the in-kind replacement of brick treads and landing and to paint the railing, per supplemental materials received 5 May 2026, which per the Old Georgetown Board's direction indicates the cable that wraps around the landing is removed from public view. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 26-183
No objection to issuance of permit for the installation of 276 solar panels on the flat roofs of the Fisher Athletic Center at the Georgetown Visitation Preparatory School, per the mockup completed 30 April 2026 and the supplemental materials received 1 May 2026. Panels proposed for the Nolan Center for the Performing Arts are not included in this application. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 26-184
No objection to issuance of permit for removal of awning and installation of new pin-mounted, halo-lit sign reading "Love Couture Bridal," per materials received 17 April 2026, which indicate sign will be installed on a back panel that is centered on the wall and painted to match the building. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 26-185
Returned without action. Permit application for roof is a duplicate of the sign included in the permit application submitted under OG 26-160 / HPA 26-186.
OG 26-186
No objection to issuance of permit for replacement of the two flat metal doors on the front facade with full-lite, insulated, wood doors, general repairs, and repainting the front facade, per materials received 17 April 2026. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 26-188
No objection to issuance of revised permit for streatery in front of Levain, per materials received 17 April 2026, which indicate 2 metal tables with 2 ratan chairs, 1 planter, and no umbrellas, PROVIDED no faux plants are used. Sandwich board and branded umbrellas were removed as part of previous application. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 26-189
No objection to the concept design for a one-story rear addition, per supplemental materials received 27 April 2026; PROVIDED details are provided for the window replaced on the front elevation. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 26-190
No objection to issuance of permit for one-story garage replacement in the rear yard, per materials received 17 April 2026. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 26-191
No objection to issuance of permit for the installation of three free-standing signs in the courtyards to the east of the new MedStar building, per supplemental materials received 27 April 2026. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 26-192
No objection to issuance of permit for alterations to existing rear metal trellis, per materials received 17 April 2026, including trimming the column, relocating the purlins above the beam, and adding an aluminum sheet metal roof on top, PROVIDED necessary repairs are made to restore the front terrace to its original condition to avoid demolition by neglect. Note that addition of roof and replacement of balustrade on front terrace are not part of scope after denial by the OGB. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 26-193
No objection to issuance of permit for the removal of 7 existing AT&T antennas, installation of 4 new antennas, removal of 18 RRHs, and installation of 9 RRHs on the rooftop of the Four Seasons Hotel, per supplemental materials received 24 April 2026, which indicate the antennas and RRHs would be installed within the enclosures or the penthouse and would not be visible from the public way. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 26-194
No objection to issuance of permit for waterproofing at the front, per materials received 17 April 2026, PROVIDED the brick stoops, planters, and plaza aresalvaged/reinstalled or replaced in-kind and the existing handrails are reinstalled. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 26-195
No objection to issuance of permit to replace roof, per the supplemental materials received 11 May 2026, white indicates per the Old Georgetown Board's direction the entire gable roof would be replaced in kind with slate; if the cladding on the dormers, including their side walls and cheeks, are replaced it should be with the same slate proposed on the roof; if any gutters and downspouts are to be replaced the applicant must provide plans and show they must be round; and the applicant provide standard flashing details. Asphalt shingles are not recommended. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 26-196
No objection to issuance of permit for Flour Mill office to residential and retail conversion, per supplemental materials received 30 April 2026, which indicate the the "W" in Washington Flour would be visible on the 1922 mill's sign; the replacement and infill brick on the 1980 office building would be Glen-Gery Mid Atlantic, Modular, 70% Shenandoah, 20% Antique Red, 10% 50-DD; both the Birch and Buckskin mortar for the replacement and infill brick on the 1980 office building were not supported and the mortar instead should have more gray undertones; on the 1980 office building the infill mortar between the ribbon windows would be Mahogany and not Cocoa; on the 1980 office building the window frame would be Duranar Bronze and the infill panel would be Duranar XL Chocolate; the wood sash window with single glazing would be installed in the 1847 mill; the aluminum-frame windows on the 1922 mill would be Durinar Sunstorm Silver Gray; the Taylor Glacier Gray Wirecut brick proposed for the penthouse of the 1922 mill would have Argos Putty mortar; the penthouse screening on the 1922 building would have pewter colored metal; and the the penthouse screening on the 1847 mill would be dark metal, PROVIDED that a second mockup is completed on-site with the contractor to finalize the color of the mortar for the 1980 office building. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 26-198
No objection to issuance of permit for fenestration and lights replacement, platform removal, and masonry repair, per supplemental materials received 4 May 2026, which, per the Old Georgetown Board's direction indicate the replacement simulated-divided lite windows and doors would have midtone spacer bars in keeping with the Old Georgetown Board's Window Policy and Guidelines. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 26-199
No objection to issuance of permit for new light fixtures, per supplemental materials received 5 May 2026, which indicate 2 new fixtures will be installed - one on each side of the entrance to take the place of the existing fixtures. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 26-200
No objection to issuance of permit for installation of serving counter and enclosure for trash, mechanical equipment, and firewood, per supplemental materials received 4 May 2026, PROVIDED sign is submitted under a separate application. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 26-201
No objection to issuance of permit for rear addition, fenestration alterations, and window replacements at front and rear, per supplemental materials received 29 April 2026. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 26-203
No objection to concept design for the installation of signage for The Ledger, per supplemental materials received 27 April 2026, PROVIDED Option 3 is used for Ext-01 and is shifted to the right to be located next to the arch into the courtyard, Option 2 is used for Ext-02, and the address shown on Ext-03 is incorporated into Ext-01, which eliminates Ext-03 altogether. The size and shape of Ext-01 may need to change once changes are incorporated. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 26-204
No objection to issuance of permit for rear wood-frame addition, per supplemental materials received 4 May 2026. The OGB regrets that the existing rear windows will not be reused in proposed addition. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 26-205
No objection to issuance of permit application for the in-kind replacement of siding that will match the reveal and profile of the existing, wood repairs, and repainting, per supplemental materials received 5 May 2026, which per the Old Georgetown Board's direction includes documentation of the wood trim on the door and window on the north elevation proposed for replacement, PROVIDED if any siding is to replaced at the adjoining 1406 28th Street NW it must first be reviewed by the OGB and CFA. No insulation, siding, and barriers would be added to the walls other than to replace what already exists, and the wall thickness must not be increased. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be
resubmitted to the Commission for approval prior to the issuance of a permit.
OG 26-206
No objection to issuance of permit for one-story addition at south elevation and site work, per supplemental materials received 27 April 2026. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 26-208
Returned without action. Concept application for alterations was withdrawn at the written request of the applicant on 23 April 2026 due to it being a duplicate application. Review will continue under OG 26-111/HPA 26-129.
OG 26-209
The Commission regrets the changes were completed prior to review. No objection to concept design for painting masonry, rear window installation, and light fixture relocation on the front elevation, per supplemental materials 17 April 2026, PROVIDED the light fixture is replaced with a design that is appropriately scaled for the residence. The applicant also is encouraged to safely remove the paint on the masonry to avoid trapping moisture. File permit submission at DOB with detailed and dimensioned drawings for review by the Commission.
OG 26-210
No objection to issuance of permit for edge-lit sign reading "Blue Nile" and removal of existing lights, conduit, and power boxes at sign band, per supplemental materials received 24 April 2026, which indicate power source would be located on the interior of the building, PROVIDED all previous penetrations at the masonry are repaired. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.
OG 26-214
Returned without action. Submission materials and a site visit indicate that permit application for basement addition will not be visible from the public way. Refer to Historic Preservation Review Board.
OG 26-218
No objection to issuance of permit to install sign and paint wood storefront at Rag & Bone, per supplemental materials received 7 May 2026, which, per the Old Georgetown Board's direction indicate that the the second of line reading "New York" would not be included on the wall sign in keeping with the Board's commercial sign guidelines and matching the Rag & Bone signage at 3067 M Street NW, but a decal sign would be installed on the windows that includes "New York," as was done at 3067 M. Note: Any subsequent modifications to the approved design, including those made during DOB technical review, must be resubmitted to the Commission for approval prior to the issuance of a permit.