CFA 21/APR/22-a
Project approved by delegation. See letter dated 23 March 2022. Final design conforms with the previous recommendations of the Commission. Refer to DC Historic Preservation Office.
CFA 21/APR/22-b
Project approved by delegation. See letter dated 6 April 2022. Final design conforms with the previous recommendations of the Commission. Refer to DC Historic Preservation Office.
CFA 21/APR/22-c
Project approved by delegation. See letter dated 6 April 2022. Final design conforms with the previous recommendations of the Commission. Refer to DC Historic Preservation Office.
CFA 21/APR/22-d
No objection to the final design for a temporary donor recognition plaque at the Korean War Veterans Memorial Wall of Remembrance, per materials received 7 April 2022, which indicate that the sign will be a full-width engraved stone curb with a thermal finish that matches the color of the existing light-colored granite curbing. Refer to DC Historic Preservation Office.
CFA 21/APR/22-e
No objection to the proposed concept design to restore sections of the masonry walls in the Chesapeake & Ohio Canal, per supplemental materials received 12 April 2022, PROVIDED the timber lock gates at locks 1 and 2 are retained or replaced in-kind. Refer to DC Historic Preservation Office.
CFA 21/APR/22-f
No objection to the final design for the installation of solar panels on the roof of the Hotel Monaco (General Post Office/Tariff Commission Building), per materials received 7 April 2022. Drawings indicate that the proposed panels will be minimally visible from the public right-of-way and that anchors for exterior conduits will be driven into the mortar joints. Refer to DC Historic Preservation Office.
CFA 21/APR/22-g
No objection to the final design for the renovation of Fort Lincoln Park, per materials received 7 April 2022. Refer to DC Historic Preservation Office.
CFA 21/APR/22-h
No objection to the final design for the installation of two murals at the Anne M. Goding Elementary School, "My Flying Colors" and "From the Invisible to the Visible," per materials received 7 April 2022.
CFA 21/APR/22-i
No objection to the final design for replacement of windows and doors, and facade repairs at Brightwood Elementary School, per materials received 7 April 2022. Refer to DC Historic Preservation Office.
CFA 21/APR/22-j
No objection to the revised final design for the installation of a new elevator at Kenilworth Elementary School, per materials received 7 April 2022. This supersedes the final design as approved in CFA 15/SEP/21-f. Refer to DC Historic Preservation Office.